Local Law 11 facade work, violations removed, parking garage concrete repair and 24/7 emergency repairs, self performed by crews with 50 years behind them.
Each trade sits in its own category with its own crews, so nothing is mixed together and nothing is quietly subcontracted out.
01
Local Law 11
Facade inspection cycle, repairs and violation close out
01
Local Law 11
02
Violations Removed
DOB, DOT, sidewalk and building violations cleared
02
Violations Removed
03
Masonry & Concrete
Brick, block, stone and concrete repair and restoration
03
Masonry & Concrete
04
Parking Garage Repair
Concrete repair and remediation for parking structures
04
Parking Garage Repair
05
Waterproofing & Roofing
Keeping water out of the structure, roof to foundation
05
Waterproofing & Roofing
06
Sidewalks & Curbs
DOT sidewalk and curb replacement, formed and finished in house
06
Sidewalks & Curbs
07
Engineering & Architecture
In house engineering and architectural design
07
Engineering & Architecture
08
Safety Engineering
Site safety engineering and safety management
08
Safety Engineering
09
Emergency Repairs
24/7 response, make safe and permanent repair
09
Emergency Repairs
A parking deck is the hardest working concrete a building owns. It carries traffic, road salt, standing water and thermal movement at the same time, and chlorides work their way into the slab and attack the reinforcement inside it. Left alone that stops being a maintenance item and becomes a structural one. Garage work is sequenced bay by bay and level by level, so the structure keeps operating while it is repaired.

Local Law 11 puts every building over six storeys on a five year facade inspection cycle. An unsafe condition starts a clock, and a SWARMP condition has to be corrected before the next cycle comes round. We work the whole sequence: getting the engineer the access needed to make the survey, carrying out the repair, and clearing the violation the filing generated.
The same organisation carries the job the whole way, which is what makes the programme dates hold.
A condition survey that establishes what is actually wrong, not what is easiest to price.
Engineering and architectural work turned into a scope, a permit and a filing.
Our own scaffold, bridging and protection, erected when the work is ready.
The repair carried out by our crews rather than passed down a chain of subcontractors.
Work checked by the people accountable for it and presented for agency inspection.
The correction documented and the record closed, with a maintenance plan if wanted.
Every photograph on this site is the company's own project work.






The line runs 24 hours. Because the crews, the scaffold and the concrete capability are all in house, mobilising does not depend on another company picking up the phone.
Reserved for verified references supplied by the company.
[TESTIMONIAL 1, CLIENT TO SUPPLY]
[TESTIMONIAL 2, CLIENT TO SUPPLY]
[TESTIMONIAL 3, CLIENT TO SUPPLY]
These slots are reserved for real client references. Nothing here is invented, and the section is not published with placeholder text in it.
We list only what can be verified. Nothing on this site claims a credential the company has not stated.
Work carried out under DOB permit and inspection requirements, including FISP facade filings.
DOT approved contractor for sidewalk, curb and roadway work in the public right of way.
Licensed New York contractor. [LICENCE NUMBERS, CLIENT TO SUPPLY FOR ADVERTISING DISPLAY]
Licensed site safety managers and coordinators placed on jobs that require them.
Local Law 11, now administered as the Facade Inspection Safety Program, requires buildings taller than six storeys to have their exterior walls inspected by a qualified professional on a five year cycle. Conditions are reported as safe, unsafe, or SWARMP. Unsafe conditions require immediate action and protection, and SWARMP conditions must be corrected before the next cycle.
We self perform. The masonry, concrete, scaffolding and repair crews are ours, which is why we can commit to an emergency response and why the same organisation that files the work carries it out.
Yes. DOB and DOT violations are handled as two separate tracks because they are two separate agencies, and in both cases we do the physical correction as well as the filing and sign off.
New York City across all five boroughs, plus Rockland and Westchester counties and the wider New York metropolitan area. Our office is in Valley Cottage, New York.
The emergency line runs 24 hours. Because the crews, the access equipment and the concrete capability are all in house, mobilisation does not depend on another company's schedule.
Most of our work is on occupied buildings. Sequencing, protection, pedestrian routing and tenant access are planned as part of the scope rather than dealt with once work has started.